Коллективные закупки
Spare Parts & After-Sales Materials Procurement
Centralised spare-parts purchasing, overseas parts-hub deployment and replenishment rules to shorten after-sales response.
Обзор
For companies already shipping in volume whose spare-parts management has become messy — typically parts sent out with each machine, piling up as dead stock, while the part actually needed is out of stock and the machine waits.
The service covers demand modelling for wear and critical parts, centralised purchasing, overseas parts-hub deployment and safety-stock design. Stocking depth per part is derived from failure rate and lead time rather than rules of thumb.
Replenishment triggers by consumption or stock level are configured, and consumption analysis identifies high-failure parts for feedback to R&D. Connection to local repair networks overseas can be added.
Что входит
- Stocking depth derived from failure rate and lead time
- Centralised purchasing and overseas parts-hub deployment
- Replenishment triggered by consumption or stock level
- Consumption analysis flags high-failure parts for R&D
Характеристики
| Scope | Demand modelling, purchasing, overseas hub, safety stock |
|---|---|
| Basis | Failure rate and lead-time data |
| Replenishment | Triggered by consumption or stock level |
| Analysis | Consumption review, high-failure parts identified |
| Add-ons | Local repair network connection |
| Pricing | Per batch by parts list |
Цены по рынкам
| Рынок | Цена | Налог | Примечание |
|---|---|---|---|
| United States | USD 16,500 | 0% | Price includes export packing; duties, clearance and local delivery quoted separately. |
| Germany | EUR 15,000 | 19% | Price includes export packing; duties, clearance and local delivery quoted separately. |
| United Arab Emirates | AED 64,000 | 5% | Price includes export packing; duties, clearance and local delivery quoted separately. |
Ориентировочная цена. Итоговое предложение формируется по объёму проекта и направлению.